Katie Cole, Sequim associate engineer, measures a roadway as residents and consultants look on during a walking tour for the South Sequim Complete Streets project. Some residents on the tour said downtown neighborhoods are too small for new amenities and increased traffic. (Matthew Nash/Olympic Peninula News Group)

Katie Cole, Sequim associate engineer, measures a roadway as residents and consultants look on during a walking tour for the South Sequim Complete Streets project. Some residents on the tour said downtown neighborhoods are too small for new amenities and increased traffic. (Matthew Nash/Olympic Peninula News Group)

Sequim receives ‘complete street’ ideas

Prairie Street a tight fit for new amenities, residents say

SEQUIM — Despite Prairie Street no longer being a part of the project’s name, residents shared plenty of concerns about the roadway and other areas detailed in the city of Sequim’s new South Sequim Complete Streets Project.

About 40 community members, mostly Prairie Street residents, met for the kick-off of three days of discussion last Wednesday at the Sequim Civic Center to give input on better ways to connect east-west travelers south of Washington Street.

Over three days, city staff and consulting firm Framework held open houses, design sessions and a walking tour about better connecting U.S. Highway 101 and Washington Street.

Sequim Public Works Director David Garlington said Prairie Street seemed like a logical connection but community concerns diverted them from focusing strictly on it.

“We don’t want it to be a foregone conclusion,” Garlington said. “We’re now looking at routes from point A to point B that do the same thing.

“While Prairie has its advantages from an engineering view, we’re not stuck on Prairie. We want to get the right thing done in that neighborhood.”

Garlington said planning for this has been discussed for about seven years and is not being done to accommodate the Jamestown S’Klallam Tribe’s proposed medication-assisted treatment (MAT) facility.

“It’s not why we’re doing this,” he said. “We’re doing this to create an east-west route south of Washington Street so people coming off the highway or people who live on that side don’t all have to come to Washington.”

Garlington added that there have been concerns the city would cut through the Shaw Family Farm near Costco, but this is untrue.

“The city is not going to do any construction on the Shaw Farm without agreement by the property owner and without compensation to the property owner,” he said.

Jeff Arango, a planner for Framework, said using information compiled during various meetings, consultants and city staff will draft a proposed plan by spring 2020 for city officials to review for tentative adoption in summer 2020.

Arango said a complete street balances a multitude of needs for bicycles, vehicles, businesses and more and they “don’t necessarily all take one shape or form.”

“It really can be applied in different ways,” he said.

“It’s not a one-size-fits-all approach.”

When asked about potential costs, Arango said no plans have been cemented but that in his previous projects none resulted in an increase in tax dollars.

Arango said transportation projects often have outside funding available, too.

City staff previously said creating an east-west connection has been in the city’s Transportation Master Plan, six-year Capital Improvement Plan and its Comprehensive Plan to help relieve congestion on West Washington Street.

Between the kick-off and walking tour, residents made notes of potential challenges and assets in Sequim when considering best ways to connect the city’s Economic Opportunity Areas.

Phil Comker, who lives on Prairie Street, said, “There’s just not enough room to put parking on a street, a median, sidewalks and a bike lane.”

Arango agreed saying that all of those elements wouldn’t fit on certain streets.

Here are a sampling of some of the group’s ideas:

• Finish the Simdars Interchange.

• Consider Spruce Street north of Washington Street as an alternative route.

• Use U.S. Highway 101’s existing on- and off-ramps.

• Create a frontage road between the Economic Opportunity Zones.

• Add an interchange on South Seventh Avenue to U.S. Highway 101.

For more information on the project, visit sequim completestreets.org or contact city project engineer Dave Nakagawara at 360-582-2479.

________

Matthew Nash is a reporter with the Olympic Peninsula News Group, which is composed of Sound Publishing newspapers Peninsula Daily News, Sequim Gazette and Forks Forum. Reach him at mnash@sequimgazette.com.

More in News

Christopher Thomsen, portraying Santa Claus, holds a corgi mix named Lizzie on Saturday at the Airport Garden Center in Port Angeles. All proceeds from the event were donated to the Peninsula Friends of Animals. (Dave Logan/for Peninsula Daily News)
Santa Paws

Christopher Thomsen, portraying Santa Claus, holds a corgi mix named Lizzie on… Continue reading

Peninsula lawmakers await budget

Gov. Ferguson to release supplemental plan this month

Clallam County looks to pass deficit budget

Agency sees about 7 percent rise over 2025 in expenditures

Officer testifies bullet lodged in car’s pillar

Witness says she heard gunfire at Port Angeles park

A copper rockfish caught as part of a state Department of Fish and Wildlife study in 2017. The distended eyes resulted from a pressure change as the fish was pulled up from a depth of 250 feet. (David B. Williams)
Author to highlight history of Puget Sound

Talk at PT Library to cover naming, battles, tribes

Vern Frykholm, who has made more than 500 appearances as George Washington since 2012, visits with Dave Spencer. Frykholm and 10 members of the New Dungeness Chapter, NSDAR, visited with about 30 veterans on Nov. 8, just ahead of Veterans Day. (New Dungeness Chapter DAR)
New Dungeness DAR visits veterans at senior facilities

Members of the New Dungeness Chapter, National Society Daughters of… Continue reading

Festival of Trees contest.
Contest: Vote for your favorite tree online

Olympic Medical Center Foundation’s Festival of Trees event goes through Dec. 25

“Angel” Alleacya Boulia, 26, of St. Louis, Mo., was last seen shopping in Port Angeles on Nov. 17, National Park Service officials said. Her rented vehicle was located Sunday at the Sol Duc trailhead in Olympic National Park. (National Park Service)
National Park Service asks for help in locating missing woman

Rented vehicle located Sunday at Sol Duc trailhead

Kendra Russo of Found and Foraged Fibers in Anacortes holds a mirror as Jayne Johnson of Sequim tries on a skirt during a craft fair on Saturday in Uptown Port Townsend. (Steve Mullensky/for Peninsula Daily News)
Mirror image

Kendra Russo of Found and Foraged Fibers in Anacortes holds a mirror… Continue reading

Flu cases rising on Peninsula

COVID-19, RSV low, health official says

Clallam board approves levy amounts for taxing districts

Board hears requests for federal funding, report on weed control

Jury selected in trial for attempted murder

Man allegedly shot car with 2 people inside